In early 2012 J.C. Penney stopped running sales. No coupons, no clearance racks, one everyday price. The change went to all 1,100 stores at the same time.
Someone inside the company suggested trying it in a few stores first. The CEO, Ron Johnson, had built Apple's retail stores, and his reported answer was "We didn't test at Apple."
Revenue for the year fell from 12.98 billion. That is a 24.8% drop, about $4.3 billion, and the company's lowest annual revenue since 1987. Johnson was out 17 months after he started, and the coupons came back.
The usual lesson drawn from this is "test before you launch." That is true and not very useful. The more useful lesson is about timing. With 1,100 stores, Penney could have run the new pricing in 50, watched the other 1,050, and had an answer in a quarter at a fraction of the cost. The option was available until launch day. After that, every store had the change, nothing was left to compare against, and the only measurement left was the income statement.
Most strategy changes can be measured. They stop being measurable the day everyone gets them.
Why intuition is not a measurement
Penney's leadership was not careless. They were confident, and confidence is the problem, because the track record of confident ideas is poor wherever someone has bothered to keep score.
Microsoft kept score. Across the experiments it ran on its products, about a third of ideas improved the metric they were built to improve. A third did nothing. A third made things worse. These were ideas that smart, well-informed teams believed in enough to build. Stefan Thomke at Harvard Business School, who has studied business experimentation for decades, puts the typical win rate closer to 10%.
Physical retail is no different. Kohl's piloted adding furniture to its product mix in 70 stores. The reasoning was sound: big-ticket items, higher basket value. The measured result was a net decrease in sales, because the furniture pushed other products off the floor. Nobody would have seen that in a planning deck. It took 70 stores and a comparison group.
If two out of three well-reasoned ideas do not work, then a launch review that only asks "did the number go up" is going to approve a lot of things that did nothing.
Why before-and-after overstates the result
The most common way to measure a strategy change is to compare the weeks after with the weeks before. It is also the least reliable, because it hands the change credit for everything else that happened in those weeks.
Here is a small example I built so the true answer is known. A grocery chain adds curbside pickup at 20 of its 60 stores, shortly before the holidays. I set the real effect of pickup to $6,000 per store per week.

| How you measure it | Result per store per week |
|---|---|
| Pickup stores, after vs before | +$17,500 |
| Pickup stores vs the other stores, after | +$39,900 |
| Change in pickup stores minus change in others | +$6,400 |
| The truth | +$6,000 |
The first number is almost three times too large, because the holidays lifted every store by about 33,500 ahead. Only the third comparison lands near the truth, and it is the only one that uses the 40 stores that were left alone.
That is the whole logic of measuring strategy. You need to know what would have happened anyway, and the only reliable source for that is a group that did not get the change.
How companies measure a strategy change in practice
A website can show two versions of a button to two random halves of its visitors. Strategy rarely works that way. You cannot charge random customers different prices in the same store, or give half a city a new delivery model. So companies that take measurement seriously pick a design that fits how the change rolls out.
| The situation | What gets used |
|---|---|
| You choose which locations get the change | A pilot in some stores, with the rest as comparison |
| It goes to whole markets, and there are few | A geo experiment with matched or synthetic control markets |
| Everyone shares one marketplace | A switchback: on and off by region and time window |
| It already launched | Difference-in-differences |
| Dozens of changes over a year | A long-term holdout group |
Store and market pilots. This is what Kohl's did and Penney didn't. If you get to choose which stores go first, choose them at random. Stores picked because their managers are keen, or because they are already growing, will beat the rest whether the change works or not.
Geo experiments. A TV campaign or a regional price change hits a whole market, and there may be only a handful of markets. The approach here is to find other markets whose sales tracked yours closely before launch, or to build a weighted blend of several, and use that as the stand-in for what would have happened. Google's CausalImpact and Meta's GeoLift are open tools built for this. Netflix says plainly on its research site that some questions cannot be randomized and that it relies on quasi-experiments for them.
Switchbacks. In a delivery marketplace, giving half the customers faster dispatch slows it down for the other half, because they share the same couriers. The comparison group is contaminated by design. DoorDash handles this by switching a whole region between the new and old logic by time window, then comparing the windows.
Difference-in-differences. This is the third row of the pickup table: the change in the group that got it, minus the change in a group that didn't. It is the method for changes that already happened. The best-known example is from 1994. New Jersey raised its minimum wage from 5.05, and economists David Card and Alan Krueger surveyed 410 fast food restaurants there and across the border in Pennsylvania, before and after.
| Staff per restaurant | Before | After | Change |
|---|---|---|---|
| New Jersey | 20.44 | 21.03 | +0.59 |
| Pennsylvania | 23.33 | 21.17 | −2.16 |
| Difference | +2.75 |
Employment in New Jersey did not fall relative to Pennsylvania, which is not what most economists expected. Card later shared a Nobel Prize in part for this line of work. The method is a subtraction a finance director can check.
Holdouts. Individual tests tell you about individual changes. To learn what a year of changes added up to, some companies keep a small group of customers, typically 1% to 5%, on the old experience for months. Spotify reports that these holdouts have shown individually positive changes combining into a negative total. The cumulative number is also reliably smaller than the sum of the individual wins, because teams ship the tests that looked best, and the best-looking results are partly luck.
Where each method goes wrong
None of these is free of assumptions, and the failures are predictable.
The comparison group gets touched. If customers switch from a comparison store to a pilot store, one goes up and the other goes down, and the gap doubles for no real reason. Airbnb measured this in one of its own experiments: interference between the groups inflated the estimated effect by about 33%. The same criticism has been made of Card and Krueger, since the drop in Pennsylvania does much of the work in their result.
Something else changed at the same time. If the pilot stores also got a remodel that quarter, you measured the remodel too.
The groups were already on different paths. A comparison only works if the two groups moved together before launch. Plot the months before. If the lines were drifting apart already, no method fixes it.
The effect fades. New things get attention. A lift measured in the first four weeks is often not the lift in month six, which is one more reason long holdouts exist.
What to do before the next strategy change
Here is how I would run it. Very little of it is statistics, and almost all of it happens before launch.
Get into the conversation before the decision is announced. Once the change has gone everywhere, the best analyst in the world can only offer a careful guess. The single most valuable thing a data scientist does for a strategy change is ask, early, "what are we holding back?"
Write a one-page measurement plan. It needs five lines. The decision this will inform. The one metric that decides it. The smallest effect that would justify the cost. Which stores, markets, or customers will not get the change, and for how long. The date the result will be read. Get the person who owns the decision to agree to it in writing. Thomke and his co-author Jim Manzi make this their central point: an experiment is only worth running if people commit beforehand to act on what it shows.
Ask what result would change the plan. If the answer is "none," say so and save everyone the effort. Sometimes a company goes ahead for reasons a metric will not capture, and that is a legitimate choice. It should be made knowingly, not dressed up as a test.
Pick the simplest design the rollout allows. Random assignment if you control who gets it. Matched markets if you don't. Difference-in-differences if it already shipped. A simple design with a clean comparison group beats a sophisticated model with none.
Check the comparison before you report anything. Did the groups move together before launch? Did anything else change? Could customers move between groups? Three questions, and they catch most bad results.
Report a range, and expect it to be smaller than people hoped. In the pickup example the honest answer is "between 8,400 per store per week." That is a less exciting sentence than "$17,500," and it is the one that will still be true next year.
When you could not measure it, say that. "Sales rose 11% after launch, and we have no way to separate the launch from the season" is a useful sentence. It tells leadership exactly how much weight the number can bear, and it makes the case for holding something back next time.
This post is about choosing the design. To run the two you will use most, an A/B test and a difference-in-differences, on this same pickup data, see A/B Testing vs Difference-in-Differences in Python. It covers sample sizes, peeking, placebo tests and clustered standard errors, with code you can run.
Seven things worth remembering
- A strategy change is measurable until the day everyone gets it.
- Most well-reasoned ideas do not improve the metric they target. Measured win rates run from one in ten to one in three.
- Before-and-after gives the change credit for the season, the economy, and everything else in those weeks.
- Every credible method needs a group that did not get the change.
- Match the design to the rollout: pilot, matched markets, switchback, difference-in-differences, or holdout.
- Agree on the metric, the threshold, and the read date before launch, with the person who owns the decision.
- Report a range, and say so plainly when something could not be measured.
If the gap between "these groups differ" and "this change caused it" is new territory, Regression Coefficients Are Not Causal covers it from the modeling side. Getting into the room before the decision is made is its own skill, and Where Analytics Leaders Need to Be is about that. For where this kind of work sits in a longer career, see the data career guide.
Sources
- Stefan Thomke and Jim Manzi, The Discipline of Business Experimentation, Harvard Business Review, 2014
- Fortune, How to design reliable business experiments, on the Kohl's furniture pilot
- JCK, J.C. Penney lost nearly $1 billion in 2012
- Ron Kohavi, Online Controlled Experiments: Introduction, Learnings, and Humbling Statistics
- HBS Working Knowledge, Creating the Experimentation Organization
- Netflix Research, Experimentation and Causal Inference
- Clustered Switchback Designs for Experimentation Under Spatio-temporal Interference, on DoorDash
- Brodersen et al., Inferring causal impact using Bayesian structural time-series models
- Spotify Confidence, Holdout group
- Airbnb interference study
- Difference-in-Differences in the Presence of Unknown Interference, which reproduces the Card and Krueger table
Get the next one